Subcomité | Título de subcomité | Normas publicadas | Normas en desarrollo |
---|---|---|---|
ISO/TC 82/SC 7 | Sustainable mining and mine closure | 5 | 1 |
ISO/TC 82/SC 8 | Advanced automated mining systems | 1 | 1 |
Filtrar :
Norma o proyecto bajo la responsabilidad directa de ISO/TC 82 Secretaría | Etapa | ICS |
---|---|---|
High-tensile steel chains (round link) for chain conveyors and coal ploughs
|
95.99 | |
High-tensile steel chains (round link) for chain conveyors and coal ploughs
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 1: General rules of representation
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 2: Representation of sedimentary rocks
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 3: Representation of magmatic rocks
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 4: Representation of metamorphic rocks
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 5: Representation of minerals
|
95.99 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 5: Representation of minerals
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 6: Representation of contact rocks and rocks which have undergone metasomatic, pneumatolytic or hydrothermal transformation or transformation by weathering
|
90.93 | |
Graphical symbols for use on detailed maps, plans and geological cross-sections — Part 7: Tectonic symbols
|
90.93 | |
Rock drilling — Integral stems
|
95.99 | |
Rock drilling equipment — Integral stems
|
90.93 | |
Rock drilling — Hollow hexagonal drill-steels in bar form
|
95.99 | |
Rock drilling equipment — Hollow drill steels in bar form, hexagonal and round
|
90.93 | |
Rock drilling — Forged collared shanks and chuck bushings for hollow hexagonal drill-steels
|
95.99 | |
Rock drilling equipment — Forged collared shanks and corresponding chuck bushings for hollow hexagonal drill steels
|
90.93 | |
Mining — Shackle type connector units for chain conveyors
|
95.99 | |
Mining — Shackle type connector units for chain conveyors
|
90.93 | |
Rock drilling — Rotary drill-rods and rotary drill-bits for dry drilling — Connecting dimensions
|
90.93 | |
Rock drilling — Drill-rods and detachable bits for percussive drilling
|
95.99 | |
Rock drilling equipment — Drill rods with tapered connection for percussive drilling
|
90.93 | |
Rock drilling — Extension drill-steel equipment for percussive long-hole drilling — Rope-threaded equipments 7/8 to 1 1/4 in (22 to 32 mm)
|
95.99 | |
Rock drilling — Extension drill-steel equipment for percussive long-hole drilling — Rope-threaded equipments 1 1/2 to 2 in (38 to 51 mm)
|
95.99 | |
Rock drilling — Extension drill-steel equipment for percussive long-hole drilling — Reverse-buttress-threaded equipments 1 1/16 and 1 1/4 in (27 and 32 mm)
|
90.93 | |
Rock drilling — Extension drill-steel equipment for percussive long-hole drilling — Reverse-buttress-threaded equipments 1 1/2 to 2 1/2 in (38 to 64 mm)
|
90.93 | |
Stranded wire ropes for mine hoisting — Technical delivery requirements
|
95.99 | |
Stranded wire ropes for mine hoisting — Technical delivery requirements
|
90.20 | |
Stranded wire ropes for mine hoisting — Fibre components — Characteristics and tests
|
90.20 | |
Stranded wire ropes for mine hoisting — Impregnating compounds, lubricants and service dressings — Characteristics and tests
|
90.20 | |
Rotary core diamond drilling equipment — System A — Part 1: Metric units
|
90.93 | |
Rotary core diamond drilling equipment — System A — Part 2: Inch units
|
90.93 | |
Rotary core diamond drilling equipment — System B — Part 1: Metric units
|
90.93 | |
Rotary core diamond drilling equipment — System B — Part 2: Inch units
|
90.93 | |
Mining — Scraper bars for chain conveyors
|
95.99 | |
Mining — Scraper bars for chain conveyors
|
90.93 | |
Mining — Drive sprocket assemblies for chain conveyors
|
90.93 | |
Locked coil wire ropes for mine hoisting — Technical delivery requirements
|
90.20 | |
Mining — Guidance on methods of verifying dimensions of sprocket assemblies for chain conveyors
|
90.93 | |
Rotary core diamond drilling equipment — System C
|
90.93 | |
Rotary core diamond drilling equipment — System C — Technical Corrigendum 1
|
60.60 | |
Rotary core diamond drilling equipment — System C — Technical Corrigendum 2
|
60.60 | |
Wireline diamond core drilling equipment — System A — Part 1: Metric units
|
90.93 | |
Wireline diamond core drilling equipment — System A — Part 2: Inch units
|
90.93 | |
Wireline diamond core drilling equipment — System CSSK
|
90.93 | |
Rock drilling equipment — Rope threaded drill steel equipment for percussive drilling, nominal sizes 22 mm to 38 mm
|
90.93 | |
Rock drilling equipment — Rope threaded drill steel equipment for percussive drilling, nominal sizes 22 mm to 38 mm — Technical Corrigendum 1
|
60.60 | |
Rock drilling equipment — Left-hand rope threads
|
90.93 | |
Mining and earth-moving machinery — Rock drill rigs and rock reinforcement rigs — Part 1: Vocabulary
|
90.92 | |
Mining and earth-moving machinery — Rock drill rigs and rock reinforcement rigs — Part 2: Safety requirements
|
90.92 | |
Mining and earth-moving machinery — Rock drill rigs and rock reinforcement rigs — Safety requirements
|
30.60 |
|
Continuous surface miners (CSM) — Safety requirements
|
90.93 | |
Underground mining machines — Mobile extracting machines at the face — Safety requirements for shearer loaders and plough systems
|
90.93 | |
Underground mining machines — Mobile extracting machines at the face — Safety requirements for shearer loaders and plough systems — Amendment 1
|
60.60 | |
Mining — Mobile machines working underground — Machine safety
|
90.93 | |
Structures for mine shafts — Part 1: Vocabulary
|
90.92 | |
Structures for mine shafts — Part 1: Vocabulary
|
20.60 |
|
Structures for mine shafts — Part 2: Headframe structures
|
90.92 | |
Structures for mine shafts — Part 2: Headframe structures
|
20.60 |
|
Structures for mine shafts — Part 3: Sinking stages
|
90.92 | |
Structures for mine shafts — Part 3: Sinking stages
|
20.60 |
|
Structures for mine shafts — Part 4: Conveyances
|
90.92 | |
Structures for mine shafts — Part 4: Conveyances
|
20.60 |
|
Structures for mine shafts — Part 5: Shaft system structures
|
90.92 | |
Structures for mine shafts — Part 5: Shaft system structures
|
20.60 |
|
Structures for mine shafts — Part 6: Design of shaft lining
|
20.20 |
|
Structures for mine shafts — Part 7: Rope guides
|
60.60 | |
Mining — Classification of mine accidents
|
90.60 | |
Mining — Classification of mine accidents — Amendment 1
|
60.60 | |
Inspection and Maintenance of Mine Shaft and Associated Structures
|
20.00 |
|
Mining — Operator enclosures — Performance requirements, testing, and operational integration of gas filtration
|
20.00 |
|
Mining — Mining methods — Specification and Classification
|
20.00 |
|
Mining — Vocabulary — Part 1: Planning and surveying
|
60.60 | |
Mining — Vocabulary — Part 2: Geology
|
60.60 | |
Mining – Vocabulary — Part 3: Rock mechanics
|
60.60 | |
Mining — Vocabulary — Part 4: Prospecting and exploration
|
60.60 | |
Mining — Vocabulary — Part 5: Drilling and blasting
|
90.92 | |
Mining — Vocabulary — Part 5: Drilling and blasting — Amendment 1
|
20.98 | |
Mining — Vocabulary — Part 5: Drilling and blasting
|
30.60 |
|
Mining — Vocabulary — Part 7: Ventilation
|
40.60 | |
Mining — Vocabulary — Part 8: Extraction
|
40.20 | |
Mining — Vocabulary — Part 9: Drainage
|
40.20 | |
Mining — Vocabulary — Part 10: Haulage
|
30.20 |
|
Mining structures — Underground structures
|
60.60 | |
Mining — Air quality control systems for operator enclosures — Performance requirements and test methods
|
60.60 | |
Mining — Air quality control systems for operator enclosures — Performance requirements and test methods — Amendment 1
|
60.60 |
No se ha encontrado ningún registro que coincida. Pruebe a cambiar los ajustes de filtro.